We installed new needle beams consisting of 2 1000-pound channels to support 3 floors of the existing dorms. The needle beams allowed a portion of the wall to be removed to expand and renovate a new student lounge area.
- Date: 08/01/2019
- Client: Rycon Construction
- Location:
- Architect:
- Contractor: MetalFab Industries
- Type:
- URL: