Project Details

Highmark Executive Floor Renovation

Project

This project was located on the 30th and 31st floor of the Highmark Building. The glass handrail was comprised of curved glass. The cane rail is made from solid 2” brass and the top rail is made from curved brass c- channel. The brass handrail posts were made of solid brass and were attached to the floor by core drilling into the marble and then epoxied in place.
  • Date: 11/01/2019
  • Client: Rycon Construction
  • Location: 
  • Architect: 
  • Contractor: Watlco, Inc.
  • Type: 
  • URL: