Project Details

Freedom Compressor Station

Project

We erected and detailed a 350’x75’ Pre-engineered metal building with an overhead crane. We also installed pipe racks for the entire project.
  • Date: 01/15/2019
  • Client: Grae-Con Construction
  • Location: 
  • Architect: 
  • Contractor: 
  • Type: 
  • URL: